Those are great videos @mr_moo! Thanks for sharing. Good to have some professional competition .
Things have been fairly quiet the last few days, so no photos. The assembly of roof panels continues and there is now a large stack in front of the west building. On the east side it looks like preparation is being made to pour the concrete floor.
I am guessing we will see another burst of activity at the weekend after next as there looks to be a scheduled posession for the bank holiday.
Automerged Update from Saturday 27/04 (and photos added): I managed to get down to take some pictures this morning. At the station site you can see the pile of finished roof sections waiting to be lifted into place. I think you can see the foundations for the supporting columns to the south of the finished building. This will be the roof for the station canopy and cycling parking. It looks like work is underway preparing the trackbed in p1/p2 with most of the cables now removed and the few remaining pushed to one side by the look of it.
There was also a crane in operation near Addenbrookes road. I believe it is installing a bridge over Hobson's brook which will be the new access to the field there now that Duke's crossing over the railway has been closed. You can see the crane in the distance of IMG_6670 to get an idea of where it is located.
Things have been fairly quiet the last few days, so no photos. The assembly of roof panels continues and there is now a large stack in front of the west building. On the east side it looks like preparation is being made to pour the concrete floor.
I am guessing we will see another burst of activity at the weekend after next as there looks to be a scheduled posession for the bank holiday.
Automerged Update from Saturday 27/04 (and photos added): I managed to get down to take some pictures this morning. At the station site you can see the pile of finished roof sections waiting to be lifted into place. I think you can see the foundations for the supporting columns to the south of the finished building. This will be the roof for the station canopy and cycling parking. It looks like work is underway preparing the trackbed in p1/p2 with most of the cables now removed and the few remaining pushed to one side by the look of it.
There was also a crane in operation near Addenbrookes road. I believe it is installing a bridge over Hobson's brook which will be the new access to the field there now that Duke's crossing over the railway has been closed. You can see the crane in the distance of IMG_6670 to get an idea of where it is located.